Manufacturing and construction
The process for completing the design and construction of a building is often divided into stages. This can be helpful in establishing milestones for the submission of progress reports, the preparation of information for approval, client gateways, and for making payments.
However, there is a great deal of ambiguity between the naming of stages by different organisations and the definition of what individual stages actually include, and so it is important that appointment documents make it clear specifically what activities fall within which stage, and what level of detail is required.
‘Manufacturing and construction’ is a new stage introduced by the RIBA Plan of work 2020. This replaces ‘Construction’ in the 2013 edition and reflects the increasing prevalence of manufactured systems and components and volumetric construction.
The RIBA Plan of Work is published by the Royal Institute of British Architects (RIBA). Split into a number of key project stages, the RIBA Plan of Work provides a shared framework for design and construction that offers both a process map and a management tool.
The RIBA Plan of Work 2020 changed the structure of the stages as shown below:
| Stage | 2013 edition | 2020 edition |
| 0 | Strategic definition. | Strategic definition. |
| 1 | Preparation and brief. | Preparation and briefing. |
| 2 | Concept design. | Concept design. |
| 3 | Developed design. | Spatial coordination. |
| 4 | Technical design. | Technical design. |
| 5 | Construction. | Manufacturing and construction. |
| 6 | Handover and close out. | Handover. |
| 7 | In use. | Use. |
The 2020 edition of the RIBA Plan of Work suggests that stage 5, manufacturing and construction: ‘…comprises the manufacturing and construction of the Building Systems in accordance with the Construction Programme agreed in the Building Contract. Increasingly, digital technologies are being used to rehearse different construction activities, allowing Stage 5 to be faster and safer. As the construction industry moves towards greater uptake of offsite manufacturing, greater emphasis is also placed on the logistics of getting materials and large-scale components to site on time, and on the management of supply chain partners.’
Stage 5 concludes by issuing a practical completion certificate which allows the completed development to be handed over to the client. The Plan for Use Strategy described by the RIBA requires that several tasks are undertaken to prepare for this, before and after practical completion.
[edit] Related articles on Designing Buildings Wiki
- BREEAM and RIBA stages.
- Comparison of BIM work stages.
- Governance for Railway Investment Projects (GRIP).
- NBS.
- OGC gateway review.
- Plan of work.
- Project lifecycle for major road projects.
- Record keeping.
- RIBA Plan of Work for Fire Safety.
- RIBA plan of work v project plans v OGC gateways.
- RIBA plan of work.
- RIBA plan of work 2020.
- RIBA.
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.